Home
Sitemap
Favorites
FAIL (the browser should render some flash content, not this).

 

 

 

1. The material check and get down

we get down the seamless pipe to the space place,it is

buy from big factory in china.

seamless pipe fittings produce step one.

 

 

 

2. The pipe cut

we cut the pipe by saw.

seamless pipe fittings produce step two.

 

 

3. cutting pipe waitting

waitting for produce

seamless pipe fittings produce step three.

 

4. shot-blasting

the elbow in shot-blasting machineitting waitting shot-blasting.

seamless pipe fittings produce step four.

 

 

5. initial seamless elbow

the initial seamless elbow, waitting step process.

seamless pipe fittings produce step five.

 

 

6. painting

this is after painting,waitting to dry.

seamless pipe fittings produce step six.

 

 

7. packing

paching of pallet .

seamless pipe fittings produce step seven.

8. finish seamless pipe fittings

waitting to our client.

seamless pipe fittings produce step eight.

HomeProductsHistoryQuality AssuranceServicesContacts
©Hebei Shengtian Pipe fittings Group Co.,Ltd.  Add:Xiwang New Distric,Mengcun County,Hebei Province,China. 我要啦免费统计

Seamless pipe fittings    TEL:0086-317-5298199    Email:sales@stpipefitting.cn   Skype:stpipefitting@hotmail.com